Castlebar Government Offices Case Study
Challenges
The roof area of this government office building was complex due to expansion joints, air conditioning units and intricate detailing requirements. Work hours had to be agreed with the client to keep disruption to other ongoing work at the site to a minimum and insulation upgrades were necessary to satisfy building regulations. The office also had to remain open throughout the works, causing some logistical challenges.
Solutions
Bauder’s premium bituminous system, BTRS, was specified because it is durable, robust and can withstand permanently sited loads of up to 2000Kg/m². The system build-up included Bauder’s 100 mm Thermotech Glass insulation for superior thermal performance, ensuring the roof achieved the required 0.17 U-Value. Small linking roof areas were waterproofed using Bauder’s single ply PVC system, Thermofol, which is long lasting, possesses high tensile strength of over 1100N, and allows for no physical penetrations of the roof. All deliveries were timed so not to cause any disruption to visitors coming in and out of the facility.