Battle of Britain Memorial Case Study
Challenges
The client wanted the new visitor centre building to replicate the shape of the iconic spitfire wing and to be waterproofed with a roofing system that would be aesthetically pleasing due to its high visibility. A particularly challenging element of the installation was the amount of intricate detailing requirements due to the elliptical shape and 5⁰ pitch of the wing areas. The waterproofing system needed to incorporate insulation that would achieve a 0.16 U-value and the memorial site had to remain open throughout the works causing logistical challenges.
Solutions
Bauder’s anthracite coloured Thermofol single ply system was specified because it is high-quality, long lasting and with the addition of welded roof profiles gives the appearance of a standing seam metal roof. The system build-up included Bauder’s 160mm PIR Insulation for superior thermal performance and all deliveries were timed as not to conflict with vehicles moving in and out of the facility. Despite the challenges encountered the project was completed in time for its official opening by the Queen in March 2015.