Synopsis
Bauder Building Board
Project | The Walnuts School |
---|---|
Type | New build |
Location | Hazeley |
Roof size | 2,000 m2 |
Specifier | Architectural MK |
Roofing contractor | Voland Asphalt Ltd |
The specification
Due to the building’s exposed location, wind uplift calculations were performed prior to work commencing, making sure the new roof could resist extreme weather conditions. Bauder Thermofol PVC single ply waterproofing system was specified because it is robust, has a life expectancy in excess of 30 years as stated in BBA certificate 06/4354. The PVC formulation ensures it is resistant to chemicals and micro-organism attack making it ideal for green roof situations. The system build-up included BauderPIR M 60 insulation for efficient thermal performance, ensuring the roof achieved the required 0.25 U-Value.
Products applied
Integrated single ply waterproofing system, featuring 1.5mm membrane offering high tensile strength of over 1100N and can be guaranteed for up to 20 years depending on system type.
A lightweight, easy to maintain sedum blanket that provides instant greening to the roof.
The result
Despite design and logistical challenges, the new roof system was delivered on time and to budget with all deliveries scheduled as not to conflict with vehicles moving in and out of the facility.
System Build Ups
BauderThermofol PVC single ply waterproofing system with BauderGREEN XF 301 sedum system
BauderThermofol PVC
Single ply waterproofing system with BauderGREEN XF 301 sedum system
Function
Cap Sheet
Function
Sedum system