Meridian High School

Bauder Total Roof System PLUS with Bauder structural rooflights

Project Type:
Refurbishment
Sector:
Education
Technical Objective:
Roof Glazing
System:
Reinforced Bitumen Membrane
Location:
London

Synopsis

Meridian High School is a coeducational secondary school with academy status, located in the New Addington area of the London Borough of Croydon.

  • Aerial view of Oughterard National School with Bauder Thermofol PVC single ply waterproofing system installed
  • Aerial view of Oughterard National School with Bauder Thermofol PVC single ply waterproofing system installed
  • close up Aerial view of Oughterard National School with Bauder Thermofol PVC single ply waterproofing system installed
  • Aerial view of Oughterard National School with Bauder Thermofol PVC single ply waterproofing system installed

Bauder Building Board

Project

Oughterard National School

LocationOughterard
Roof size

3,400 m²

Specifier

JJ Rhatigan

Type

New build

Approved contractor

Deane Roofing & Cladding

The specification

Bauder area technical manager, Chris Clarke, carried out a condition report on the flat roof areas that were causing concern. Core samples were taken from various locations of the roof. They identified that areas of the deck were damp, confirming that the waterproofing was failing there. A visual appraisal showed that several of the roof areas had substantial greenery growing on them and detritus that was, in some instances, blocking the guttering. The roof surface was showing typical signs of ageing such as surface oxidisation, cracks, splits, blisters, rucks, and laps coming apart.

The thermal performance of the existing roof build-up was poor and well below current standards. One of the risks associated with inadequate levels of insulation is the potential for condensation to form within the structure or waterproofing system during periods of climatic extreme. The insulation on this project would need to be upgraded to meet current Building Regulation requirements.

The survey confirmed that the existing waterproofing on much of the building had come to the end of its service life and needed refurbishment before a serious failure occurred. The proposal for the renovation included upgrading the insulation, replacing the rooflights and increasing the upstand height around the glazing.  

Products applied

Bauder Total Roof System PLUS:
Fully integrated bituminous roof system, featuring the most advanced bitumen membrane currently available, BauderKARAT.

BauderPIR FA-TE:
PIR insulation in a variety of thicknesses to achieve the required U-value for the school. Ideal where weight loadings may be a consideration.

Structural rooflights:
Modern thermally efficient structural rooflight, and kerbs were raised where necessary to create a minimum upstand of 150mm.

System Build Up

Bauder Total Roof System PLUS with Bauder Structural Rooflights

Bauder Total Roof System PLUS (BTRS+)

Bauder Total Roof System PLUS (BTRS+)

with Bauder Structural Rooflights

Bauder Total Roof System (BTRS) PLUS utilises the latest manufacturing technology with a dual formulation cap sheet, uniting both APP and SBS polymer bitumen modifications for strength and flexibility.