Victoria Road Sports Pavilion
BauderGREEN XF 301 Sedum System with Bauder Thermofol single ply waterproofing system
Synopsis
This sports facility in Victoria Recreation Ground provides a new home for Portslade Bowls Club. The project was nominated for two categories in 2022’s Single Ply Roofing Association (SPRA) awards: Best New Construction 2020 and Best Sustainability 2020.
Bauder Building Board
Project | Oughterard National School |
---|---|
Location | Oughterard |
Roof size | 3,400 m² |
Specifier | JJ Rhatigan |
Approved contractor | Deane Roofing & Cladding |
Type | New build |
The specification
The Bauder Single Ply Thermofol Green Roof System was specified for this project. This single source, lightweight system provides a (U-Value) of 0.15 W/m²K and incorporates a multifunctional water retention and filter layer. The weather tight roof covering is secure and free draining.
Project challenges
It was paramount that the timing of the delivery and resources available were planned effectively to ensure the Green Roof was not compromised due to the BauderGREEEN XF 301 vegetation blanket being harvested as a live product. Working together as a team was key to a successful project delivery.
All waterproofing systems were installed through workmanship that complied with current Codes of Practice, BS6229. By joining forces with approved contractor ICS roofing and taking a collaborative approach, the installation of this project was smooth, and all installation challenges were identified and resolved at the design stage.
This installation follows the ‘Safe2Torch’ guidance produced by the National Federation of Roofing Contractors (NFRC) as a heat welding method was used to install the Single Ply Membrane.
System Build Up
Bauder XF 301 Sedum System
BauderGREEN XF 301 Sedum System
Visit our Technical Centre for more informationFunction
Sedum system
Advocacy
Industrial Construction (Sussex) Limited:
"The technical and sustainability expertise and support available from the Bauder technical team and area manager, coupled with the comprehensive guarantee package made Bauder the ideal supplier to work with on this project."