Synopsis
The replacement bus station and regeneration of the surrounding area has created a unique and distinctive city centre building for the town. The design connects with Gloucester’s Roman heritage and association with aviation. The innovative roof design incorporated a canopy intended to reflect an aircraft wing that required a lightweight waterproofing and renewable energy photovoltaic (PV) solution.
Bauder Building Board
Project | Gloucester Bus Station |
---|---|
Type | New build |
Location | Gloucester |
Roof size | 1, 520 m² |
Contractor | Kier Group Plc |
Approved contractor | Kovara Projects Ltd |
The specification
The Bauder single ply Thermofol PVC waterproofing system with the BauderSOLAR F PV solution met the brief precisely without compromising the aesthetics of the roof. This combination of Thermofol PVC single ply waterproofing system and BauderSOLAR F PV delivered a high quality, strong, energy efficient flat roof.
This system was selected for the project because of its lightweight properties which complemented the deck and roof design. Light grey was chosen to reflect the colour of the cladding as the aesthetics was a key objective for the client.
The OMG Rhinobond induction welding system was specified as the installation method which provided multiple advantages to the project, not only saving time and fasteners, but also optimising the field fix pattern of installation and ensuring that the load on the roof was spread between the induction welding plates.
Products applied
A high grade virgin polymer Thermofol PVC membrane ensures the optimum membrane characteristics to deliver high performance and a BBA stated life expectancy in excess of 35 years.
An aerodynamically optimised system for flat roofs using framed modules and mounting units, securing them to the roof using membrane-to-membrane welding techniques. This installation method means that the roof is not compromised by penetrations of fasteners or is it ballasted.
Project challenges
The design of the Transport Hub and city centre location proved to be the key challenge to this project. The unusual roof configuration required a bespoke insulation scheme using BauderPIR M, an efficient rebated PIR insulation board, in order to achieve the required U-value of 0.18W/M²K.
The deck configuration equally made the installation of the Bauder Thermofol PVC waterproofing system complex with the perimeter zone having to be carefully marked in compatibility with the wind calculation which included measuring factors such as wind speed, altitude, direction and exposure. Bauder and Kovara Projects were required to work closely together to ensure all criteria of the wind calculations were met. 40 modules of the lightweight BauderSOLAR PV solution were installed on the west side of the Transport Hub’s roof.
The location of the project, Gloucester city centre, presented logistical challenges. Delivery of the roofing products had to be carefully scheduled and managed to avoid creating congestion in the area.
The result
The installation required constant co-operation and communication to embrace the live site operations within the restricted city centre location whilst allowing the bus station to remain fully functional. The roofing contractor delivered a superior standard solution and any complex issues that arose during the project were resolved promptly and collaboratively.
System Build Up
BauderThermofol PVC single ply waterproofing system
Function