01473 257671Contact usMembers Area
Benson House, a modern glass faced building in Leeds

Benson House

Bauder Bakor 790-11 hot melt structural waterproofing with intensive green roof

Project Type:
Refurbishment
Sector:
Commercial
Environmental Focus:
Intensive Green Roof
System:
Hot Melt, Green Roof
Location:
Yorkshire and the Humber

Synopsis

Benson House is a Liquid Waterproofing Awards 2019 winning refurbishment project situated in the city centre of Leeds. The client, DLG Architects, required landscaping around the site to transform the existing podium car park into a landscaped deck, and a new scheme to complement the updated entrance.

  • Benson House, a modern glass faced building in Leeds
  • Bauder Bakor 790-11 hot melt structural waterproofing with intensive green roof being installed
  • Bauder Bakor 790-11 hot melt structural waterproofing with intensive green roof being installed
  • Bauder Bakor 790-11 hot melt structural waterproofing with intensive green roof installed

Bauder Building Board

Project

Benson House

TypeRefurbishment
LocationLeeds
Roof size

1,500 m²

Specifier

DLG Architects

Approved contractor

Protech Roofing Ltd

The specification

Bauder hot melt structural waterproofing system was specified for this project as this system is suited beneath paved or ballasted surfacing, car parks, podiums, plazas, green roofs and substructures. This system provides a monolithic, fully bonded waterproofing membrane that is tough, flexible and self-healing to minor punctures.

Intensive substrate and turf was also specified to provide valuable recreational space to the podium car park. The turf was bespoke to the project and together with the intensive substrate helps with storm water management, with the drainage layer and substrate keeping the system weight to a minimum.

Project challenges

The existing slab was not level, and so prior to beginning the waterproofing installation, Approved Contractors, Protech Roofing Ltd, had to flood the slab with hot melt to level the surface. As this was a refurbishment project, the installers had existing planters and upstand details to overlay. The outlets also had to be replaced and the system fully sealed. Access to the rest of the site for other trades was through the main working ground. Being in the city centre of Leeds, the site access was also rather restricting.

To solve these challenges, the waterproofing was tested and repaired continuously with the results reported back to the client to keep them informed. The contractors arrived to site early in the morning to avoid rush hour traffic and to minimise the impact on surrounding businesses.

System Build Up

Bauder Hot Melt Structural System with Turfed Intensive Green Roof System

Bauder Hot Melt Structural Waterproofing System

Bauder Hot Melt Structural Waterproofing System

Bauder Hot Melt Waterproofing System is designed for use in inverted or buried roof scenarios. It is a hot-applied polymer-modified bitumen waterproofing applied in two layers with a polyester reinforcement. 

Visit our Technical Centre for more information
Turfed Intensive Green Roof System

Turfed Intensive Green Roof System

The BauderGREEN intensive landscape system enables full landscapes to be created above a waterproof structure. 

Bauder’s turfed-intensive green roof system is very environmentally friendly, with the substrate including a high proportion of recycled crushed brick and aggregate, the protection, filtration, and isolation layers manufactured from recycled materials, and the DSE40 water storage and drainage layer manufactured from recycled polyethylene.

Visit our Technical Centre for more information