01473 257671Contact usMembers Area
Roof completed with Hot Melt waterproofing system

Hot Melt Roof Systems

Bauder Hot Melt waterproofing systems are designed for use in inverted or buried roof scenarios.

Hot Melt Roof System

Bauder Bakor Hot Melt System achieves a CCPI mark which recognises that any claims made about it have been independently assessed across 11 clauses, providing greater clarity by offering improved product information. This gives specifiers confidence in the knowledge that they will have unambiguous information when deciding which of our systems is best for their new build or refurbishment project.

Bauder Hot Melt CCPi

When to specify

Bauder Hot Melt waterproofing system is a hot applied polymer modified bitumen waterproofing applied in two layers with a polyester reinforcement. It is capable of a 100% bond to the approved surfaces it is applied. 

Hot melt structural waterproofing is particularly advantageous for protected, inverted, or buried roofs such as biosolar roofs, blue roofs, green roofs, paved, terraces, podiums, plazas and car parks. The solution is primarily for new build projects. 

Due to its composition, it remains in a live state, giving it the strength and flexibility to cope with the stresses and strains of the building it protects for the length of time it remains.

Plus points
  • Compatible with various landscaping finishes including hard landscaping, green roofs, blue roofs and biosolar solutions.
  • Range of insulations including non-combustible options.
  • Seamless application provides monolithic waterproofing.
  • Full adhesion to deck substrate.
  • Comprehensive guarantees to meet project needs
Assessments and verifications 
  • CCPI Assessment 0007700044/1225:  
    This system's CCPI mark provides accuracy of data delivering assurance to specifiers
  • BBA Certificate 06/4350:
    Fire classification BROOF(t4) to BS EN 13501-5 tested to TS 1187 test 4 for external fire exposure on defined permutations of product build up.
    Fire properties – membranes deemed “unrestricted” in certain circumstances as categorised in the BBA certificate.
    Service life for the duration of the building.
  • EPD Certification:
    Bitumen Membranes
    BauderROCK Insulation
    BauderGLAS Insulation
    Bakor 790-11
Download specification resources

Hot Melt System

Monolithic, fully bonded installation for cold or inverted constructions.

Hot Melt system

Approvals, certification and guarantee

    • A comprehensive range of guarantee packages to fulfill cover requirements for the project (dependent on system/product selection). For more information contact our technical department for a sample guarantee outlining cover level, terms and conditions
    • CCPI Assessment Number 0007700044/1225 for Bauder Bakor Hot Melt System
    • DD ENV 1187:2002 European Standard Fire Penetration
    • EPD Certification: Bitumen membranes, BauderROCK, BauderGLAS and Bakor 790-11
Certifications

BBA Certificate 06/4350 states that: 

  • "When used in protected or inverted roof specifications, including an inorganic covering listed in the Annex of Commission Decision 2000/553/EC, can be considered to be unrestricted under the national Requirements"
  • "Under normal service conditions, the system will provide a durable waterproofing for the service life of the structure in which it is incorporated"
  • Fire testing to BROOF(t4) for external fire exposure on defined permutations of product build up
  • Suitable for zero falls (no backfalls) on the structure
Safe 2 Torch logo

Flame-Free detailing methods

Our flame-free detail design specifically delivers secure safe application techniques in the vicinity of combustible construction materials located on or connected to, the roof. This includes timber substrates or upstands; abutments to cladding, roof tiles, slates or thatch; or even debris such as dry leaf material that is at risk of ignition. 

Why clients choose us

Customers choose us because of the way in which we do business, our robust advice on the right system, and our approach to delivering projects. We work alongside clients to deliver the best solution for a building from our broad portfolio of systems. 

We assist you with the design of the detailing, writing the specifications for the flat roof solution, and recommend suitable approved contractors to tender for the project.

The service is without charge, and we work with you to ensure your roof specification meets all your needs and that of the building.

ArchitectsWorking.jpg

Six steps is all it takes

1

Brief and consultation

You give us your remit either at your office or on-site. We will discuss the roofing project, your preferred system application, your budget and how the programme of work can be formulated.

Brief and consultation
2

Roof element proposal

Together we can determine which roofing system and specific build up will be optimal for each individual roof area on your project given the construction type, level of access and required performance.

Roof element proposal
3

Specification and detail design

You will receive the Bauder specification package that answers your brief and meets the needs of the building.  As a specialist designer for our solutions, we work with the Principal Designer to include relevant standard detail drawings and other technical calculations.  

Specification and detail design
4

Contractor selection

The Bauder approved contractors best placed to deliver your new roof will competitively price and tender for your project. Our national network of contractors undergo a rigorous selection process and their installers are trained specifically in the application of our systems, so you are ensured an expert installation.

Contractor selection
5

Installation of the roofing solution

Once the Bauder approved contractor has been appointed, a pre-contract meeting will make sure that the project delivery is well coordinated. The works are closely monitored by Bauder site technicians with regular inspections and live time reports to ensure the quality and waterproof integrity of the roof.

Installation of the roofing solution
6

Sign off and guarantee

A full final inspection is completed by our site technician team before the guarantee is issued.

Bauder’s service doesn’t just stop once the roof installation has been completed, we provide industry-leading guarantees on our products that are installed by our national network of approved contractors. 

Sign off and guarantee

A selection of our Hot Melt projects

View all projects

man working on detailed computer design

Contact us today about your project

Each project is unique in its requirements, but we have case studies and examples of our work available to help guide you. If you are looking for a hot melt system for a new build project, then get in touch with our team to discuss your project’s individual needs.