790-11 EV Hot Melt

Hot melt rubberised bitumen asphalt with a percentage of post-consumer recycled materials that infills and fully bonds to all minor deviations in the deck.

Hot Melt 790-11 EV

Technical Data
DOWNLOADS Datasheet »
Colour Black
Solids content 100%
Recycled content 25%
Min. installation temperature (°F) -49
Flash point (°F) 545
Heat stability 5h @ 390 °F
Block weight (Kg) 22.6
Coverage @ 6mm (Kg/m2) 6.5