The project

Unilever, situated in the north-east of Leeds, is a substantial cosmetics factory and research site. It is the largest deodorants factory in Europe, supplying the whole of Europe.

The site has an unusual roof comprising of eight sloped areas as well as flat areas of various sizes. The works requested by the client entailed stripping the existing single ply build-up, including vapour barrier and insulation, back to the profiled metal deck. This was to then be prepared ready to receive the new Bauder Single Ply Thermofol PVC system including an insulation upgrade to meet current building regulations.  

Bauder Building Board

Project: Unilever 
Location: Seacroft, Leeds
Project type: Refurbishment
Roof size: 8749m²
Approved contractor: Watershed Roofing Ltd

Challenges

Part of the roof consisted of eight sloped areas of 715m² each at a pitch of more than 20 degrees. Bauder Approved Contractors had to take care when installing the systems. Guardrails around the perimeter were pre-existing.
 
IMG1.jpg

Existing capping on the perimeter upstand on one roof area could not be removed as it was penetrated by the handrail fixing. To solve this challenge, pre-coated metal was installed over the existing details followed by application of Bauder’s LiquiDETAIL to ensure robust waterproofing.
 
IMG2.jpg

LiquiDETAIL is a cold applied liquid fast curing waterproofing resin, for use on upstands and details. The product is a PMMA based resin that requires the addition of catalyst to trigger curing and is solvent, isocyanate and halogen free.

The Unilever site at Seacroft falls under the UK’s Control of Major Accident Hazard (COMAH) regulations because of the flammable substances stored there. This means that the entire site operates very high health and safety standards, which all operatives had to comply to whilst onsite

Watershed Roofing Ltd completed the works to a high standard working safely in the high-risk environment, including the installation of new rooflights.
 
IMG3.jpg

 

Applied products

Single-Plu.jpg
 
Bauder Thermofol 1.5mm FB (light grey) The Thermofol PVC System has a high-grade virgin polymer formulation with superior fire retardants that is particularly suitable for refurbishment projects as it is a lightweight system. The system holds hold fire classification BROOF(t4) for compliance with building regulations under TS 1187 test method 4 for external fire exposure to roofs.
BauderPIR FA 120mm An extremely efficient PIR insulation board with aluminium foil facing on both sides, Bauder PIR FA Insulation has been specially developed for use with Bauder single ply systems and can be used in either mechanically fastened or adhered applications.
BauderTEC KSD Foil BauderTEC KSD Foil is a technically advanced 1.5mm thick self-adhesive elastomeric bitumen air and vapour control layer for specification within a single ply system only.