Battle of Britain Memorial
This landmark monument has three main roof areas, featuring over 700m2 of single ply membrane, that play an integral part in creating the building's overall appearance.
View all Case Studies >> View Green Roof Case Studies >> View PV Case Studies >>
This landmark monument has three main roof areas, featuring over 700m2 of single ply membrane, that play an integral part in creating the building's overall appearance.
Replacing the roof on this distribution centre was the largest refurbishment of a single ply roof in Britain in 2012 with over 56,000m2 of Bauder's Thermofol PVC membrane installed.
This landmark office development in the City of London features Bauder's hot melt and extensive green roof systems, and boasts an 'Excellent' BREEAM rating.
The Castlebar Government Office was refurbished with over 2,500m2 of Bauder's premium bituminous sytem with its single ply Thermofol system used on small linking roofs.
This modern housing development located near Edinburgh city centre features over 9,500m2 of Bauder's Thermofol single ply system.
The balconies, walkways and 1,000m2 podium deck on this residential housing estate were waterproofed with Bauder's cold liquid applied system.
Award winning new build primary school in west Ireland consisting of eight roof areas totalling over 3,400m2 waterproofed with Bauder's Thermofol single ply mebrane.
ROM's manufacturing facility in Sheffield needed urgent remedial work, so over 9,000m2 of Bauder's premium bituminous sytem BTRS was installed.
Bauder's high quality single ply PVC system, Thermofol, was installed along with an extensive green roof with sedum blanket for an aesthetically pleasing roof solution.
Roof refurbishment of Grade II listed university building with 1,200m2 of Bauder's top quality bitumen system, BTRS, and 200m2 of green roof with plug plants.
This new college features over 3,500m2 of Bauder's Thermofol single ply system along with PVC roof profiles to replicate the appearance of a standing seam metal roof.
A thermographic survey revealed extensive water ingress so 700m2 of Bauder's single ply thermofol system was installed. All works were completed in just six weeks.