Risk-free Installation
The distinctive element of the BauderSOLAR system is in the installation of the scheme which does not require any penetration of the waterproofing or roof deck, even in a non-ballasted arrangement.
This unique installation method sets the system ahead of others and safeguards the integrity of the waterproofing and roof deck; additionally the attachment of the SOLfixx components is very stable so that even in extreme weather the entire array is secure on the roof. Any minor movement of the panels, which is generally created by wind uplift, is easily tolerated and does not affect the fixings, or waterproofing system.
Assembly of the units is carried out in two ways to suit the roof, its waterproofing system and the desired finish. The two main methods of installation are ballasting and ‘welding’ with membrane to membrane fixing techniques to either our reinforced bitumen or single ply systems. The units are lightweight delivering only 13Kg/m² and can be installed on concrete, plywood or metal profiled roof decks.
The substructure base units are designed to create a 10° angle on to which each PV module is secured; this allows for optimum energy generation per square metre across the roof area.
4.

Tool-free assembly of the units
MEMBRANE-TO-MEMBRANE WELDING INSTALLATION METHOD
1.

The SOLfixx Base Plates are positioned on the roof in accordance with the PV array plan.
2.

The membrane sleeve is placed over the top ready to be welded membrane-to-membrane to the roof waterproofing.
3.

The membrane sleeves are securely welded to the roof membrane providing a secure attachment for the substructures and PV modules.

Refurbishment of Lanchester School saved £24,500 in heating costs and reduced CO2 emissions by approximately 74 tonnes per year.
The Bauder Group, has achieved a first in environmental certification for two of its green roof products; ahead of any other roofing company in the UK.
An innovative housing development by Metropolitan Housing Trust has been awarded a CABE Building for Life Silver Standard... 
If we don’t have the skills to do it, common sense tells us that a job is not only going to be difficult but also risky and costly.
150 Cheapside is a new-build office development in the centre of London, offering 182,740 sq ft of office space with a roof terrace
York Hospital remains operational during roofing works to refurbish the 2000sq metre failing roof above the Oncology Ward. The roof...
Tony Russell, Deputy Director of Estates at University Campus Suffolk (UCS) in Ipswich knows all too well about the challenges of making a green building work.
A unique fastening system enables the support elements to be installed very quickly, easily and securely without any roof penetrations.
In recent years, changes to various sections of the Building Regulations seem to have conspired to make it very difficult to design and install flat roof waterproofing to upstands 